Skip to content

Union territory

Mushroom subsidy in Andaman & Nicobar Islands

The most a mushroom growing unit draws in Andaman & Nicobar Islands

₹114.75 lakh

The same integrated mushroom unit where the project includes canning, priced at the higher of the two per-tonne norms the clause states.

Paid by NHB Scheme No. 1.

Enhanced rate, Andaman & Nicobar / Lakshadweep, 45%. You reach that only by building all the way to the scheme’s own limit of 300 MT of installed capacity, which the scheme costs at ₹255.00 lakh. A smaller project draws proportionally less.

Your project must be bigger than 50 MT of installed capacity to qualify at all. Below that it pays nothing at all, not simply less.

Type
Union territory
Which rate applies
Island territory
Schemes that apply
9
NHB Operational Guidelines, January 2025Printed January 2025Show the clause, the page and our archived copy
Printed in the document as “1 (vi) Integrated Mushroom Production Unit in project mode, with canning”.

National Horticulture Board Operational Guidelines JANUARY 2025 (NHB Operational Guidelines, January 2025)

National Horticulture Board, Ministry of Agriculture & Farmers Welfare, Government of India (Plot No. 85, Sector-18, Institutional Area, Gurugram 122015)

Printed January 2025

Chapter 02, Scheme No. 01, cost norms table, item 1 (vi) (PDF p.17, printed page 7). Item column, verbatim: "Integrated Mushroom Production Unit in project mode". Cost norms column, verbatim: "As per NHB norms for a minimum installed capacity above 50 MT and upto 300 MT in…Read the full clause
Chapter 02, Scheme No. 01, cost norms table, item 1 (vi) (PDF p.17, printed page 7). Item column, verbatim: "Integrated Mushroom Production Unit in project mode". Cost norms column, verbatim: "As per NHB norms for a minimum installed capacity above 50 MT and upto 300 MT in controlled conditions @ Rs. 75000/MT without canning and @ Rs. 85000/ MT with Canning including Production Unit + Compost making Unit." Pattern of assistance column, verbatim: "Credit linked subsidy @ 40% of eligible project cost in General area and @ 50% of eligible project cost for NER and Himalayan States, Scheduled Areas and UTs of Andaman &Nicobar Islands, Lakshadweep Islands, Jammu & Kashmir and Ladakh." Those two percentages were cut to 35% and 45% by NHB's Public Circular of 21 August 2026, cited separately on every rate this record publishes. Read with Chapter 04, Important Instructions, item 16 (PDF p.51, printed page 40), verbatim: "In case of cold storage/CA storage, Mushroom, Ripening chamber, Reefer Van, Cold room and Pre-cooling unit, the EPC is worked out on the basis of capacity." Chapter 01 dates the whole instrument: "The Scheme guidelines shall be effective from 01.01.2025."

PDF p.17 (Chapter 02, item 1(vi)); PDF p.51 (Chapter 04, instruction 16); PDF p.14 (Chapter 01, "Date of Coming into force")

Read on 14 September 2026 by chirag.

The most any one of the 9 schemes that apply here pays for the growing rooms themselves, never a total of them. The growing rooms are not all these schemes fund: see what else they price.

Andaman & Nicobar Islands is one of the two island territories MIDH names by hand, so the central schemes pay a higher share here: 50% of what a scheme assumes an item costs, instead of the usual 40%, on the items that carry the higher rate. Andaman & Nicobar Islands’s own scheme is verified: read end to end, it funds no mushroom component of its own, though we could not confirm from the document that the scheme is still running.

See how these schemes actually work for the myths, limits and loopholes behind every figure.

What decides whether you get anything

These are the conditions NHB Scheme No. 1 carries, the scheme behind the figure above. Each of the other schemes on this page carries its own, set out on its own page.

Does this need a bank loan? (credit linked)
Yes. The subsidy rides on a bank loan: a bank sanctions the loan and the subsidy is adjusted against it.
When does the money arrive? (back ended)
After you build, and after an inspection. The subsidy is held in a reserve account and released once the project has been inspected and found complete, not paid up front.
Must it be approved before you start work? (sanction before commencement)
Sanction before commencement applies. The approving authority must issue its sanction before eligible expenditure is incurred. Read what starting work early costs you.

Andaman & Nicobar Islands’s own scheme

A&N Dept. of Agriculture

Department of Agriculture, Andaman & Nicobar Administration

Verified. Read on 13 September 2026, against the primary government document. We could not confirm the scheme is still running, so check with the department before you rely on it.

Read end to end against its primary document. It does not fund mushroom cultivation, so no rate is shown here.

What we read, and why we cannot confirm it is still currentRead the full note

Andaman & Nicobar Islands, verified 2026-09-13 against documents RECOVERED FROM THE WAYBACK MACHINE, because the live copies are gone: andaman.gov.in is STILL SERVFAIL against both 8.8.8.8 and 1.1.1.1 (re-confirmed 13 Sep 2026), and and.nic.in now resolves but the TCP connection itself fails on both port 443 and port 80, genuinely unreachable by any live fetch, not a content problem.

This pass queried the Wayback CDX index against and.nic.in (the Administration's older NIC domain, distinct from the newer andaman.gov.in and from the NIC Andaman State Unit's own informational site previously ruled out) and found a complete "Right To Information Act – 2005" proactive-disclosure set published by the DEPARTMENT OF AGRICULTURE itself under `/Citizen Services/Agriculture_rti/`, captured 10 Apr 2009 (timestamp 20090410*), fetched via the `id_` suffix for raw original bytes: - `Programmes_Dept.pdf` (primary evidence, archived below), "Programmes of the Department / OUR LOAN AND SUBSIDY PROGRAMMES": a complete, itemised, first-person description of EVERY loan and subsidy scheme the department runs, soil conservation loans (50% subsidy at year 6), input subsidies (20% on seeds/planting material, 15%/25% on fertilisers, 100% transport), plant-protection chemical subsidy (25% cost + 100% transport), tractor/power tiller subsidy (30% of cost or Rs 30,000, whichever is less), crop insurance (50% premium subsidy), and pond/pumpset subsidies (1/3 cost as subsidy, 2/3 as loan or shramdan). - `CENTRALLY SPONSORED.pdf` (archived below), "CENTRALLY SPONSORED SCHEMES IMPLEMENTED BY THE AGRICULTURE DEPARTMENT DURING 2004-05": a financial statement naming 12 individual horticultural/agricultural scheme line items under Macro Management (25% subsidy) and Macromanagement-Horticultural/High Value Agriculture (50% subsidy), arecanut rejuvenation, fruit cultivation, medicinal/aromatic plants, flowers under green house, nursery establishment, black pepper, spices area expansion, IPDM on spices, organic spice production, vegetable cultivation, bee-keeping, root/tuber crop development, with rupee figures (Rs in lakhs) for every line, total Rs 399.26 lakh for the year. - `VARIOUS SCHEMES.pdf` (archived below), "APPLICATION FORMS FOR VARIOUS SCHEMES": the department's own itemised list of every subsidy application form it issues (Soil Conservation loan Form-A, Tractor Implements loan-cum-subsidy Form-B, Pumpset loan-cum-subsidy/cash-cum-subsidy Forms C/D, Minor Irrigation Pond loan-cum-subsidy/ shramdan-cum-subsidy Forms E/F, Coconut New Planting subsidy Form-II). All three documents were read end to end and searched (grep) for "mushroom": zero matches across all three. Together they are as complete a documentation of "everything the Department of Agriculture, A&N runs" as this project is likely to find for this territory, a first-person RTI-mandated programme description, a financial statement itemising every scheme's rupee allocation, and an index of every application form, and mushroom is absent from all three.

Separately, a domain-wide Wayback CDX search across andaman.gov.in's entire historical URL index (spanning captures from 2000 to 2025) for any URL containing "mushroom" returned zero results, as did a search for "horticulture", no department-of-horticulture-specific presence was ever captured on that domain (consistent with the prior finding that horticulture and agriculture are combined under one Department of Agriculture in this UT). The state portal's own "Schemes" showcase page (andaman.gov.in/schemes, captured 2016) itemises which sectors it covers, "Schemes Under: Animal Husbandry, Education, Health Services, Social Welfare", confirming Agriculture was never one of the flagship-scheme categories highlighted there either, though this is a curated citizen-facing subset rather than the department's own full list (weaker corroboration than the three RTI documents above, recorded for completeness).

Given the age of the anchor documents (2004-05 scheme year, 2009 capture, now over 15 years old), status is recorded 'unknown' rather than 'active', and the review window is set to 90 days per this project's rule for archive-recovered evidence, not the standard 180.

No rules recorded: the department's own complete, RTI-mandated programme disclosure prices no mushroom-specific unit. Central MIDH's own mushroom rules already apply to an A&N farmer regardless of this record.

Central schemes that apply in Andaman & Nicobar Islands

These apply everywhere in India; what changes from state to state is the share they pay. Each line shows the most that scheme pays for any one item at Andaman & Nicobar Islands’s rate, and the document it comes from. Between them they also fund a compost yard, a spawn laboratory, a pack house and processing, a cold store, help with loan interest, a credit guarantee and machinery, each at its own rate.

MIDH Operational Guidelines 2025 (Guidelines dated 31.12.2024), Annexure V, Item III (Mushroom cultivation), pattern of assistance names this territory explicitly: "Andaman & Nicobar and Lakshadweep Islands" draw the enhanced (50%) rate.
  • MIDH₹300.00 lakh

    At most, for its biggest single item: The same Cold Storage Type-I, built instead as a pre-engineered building (PEB) frame combined with civil work and PUF/PIR panels, priced per tonne of storage capacity up to 5,000 MT, at a higher per-MT rate than the plain-civil row.

    Enhanced rate, Andaman & Nicobar / Lakshadweep, 50%.

    MIDH Operational Guidelines 2025Printed 31 December 2024Show evidence

    OPERATIONAL GUIDELINES MISSION FOR INTEGRATED DEVELOPMET OF HORTICULTURE (MIDH Operational Guidelines 2025)

    Department of Agriculture & Farmers Welfare, Government of India (published on nhb.gov.in)

    Printed 31 December 2024

    Annexure V, Item C.7 "Cold Storage Type-I (CS-1)", row (ii), verbatim: "Cold Storage Type-I is defined as CS-1 with Construction in combination of civil & PEB including PUF/PIR panels, Doors and Ante-rooms, Refrigeration Units, Electrical Installation, Administrative block,…Read the full clause
    Annexure V, Item C.7 "Cold Storage Type-I (CS-1)", row (ii), verbatim: "Cold Storage Type-I is defined as CS-1 with Construction in combination of civil & PEB including PUF/PIR panels, Doors and Ante-rooms, Refrigeration Units, Electrical Installation, Administrative block, Safety/Fire Safety and Hazard control and basic mezzanine structure." Cost Norms column, verbatim: "Rs. 12000/MT, (Max 5,000 MT capacity)." Pattern of Assistance column, verbatim: "Credit linked back-ended assistance @ 35% in General areas and 50% in the case of NE & Himalayan States, Scheduled areas, vibrant villages, Andaman & Nicobar and Lakshadweep Islands." plus "Note: Component has to be implemented in accordance to NCCD guidelines only."

    PDF p.66

    Read on 11 September 2026 by chirag.

    Verified against the primary government document.

    See all 8 items MIDH prices
  • NHB Scheme No. 1₹114.75 lakh

    At most, for its biggest single item: The same integrated mushroom unit where the project includes canning, priced at the higher of the two per-tonne norms the clause states.

    Enhanced rate, Andaman & Nicobar / Lakshadweep, 45%.

    NHB Operational Guidelines, January 2025Printed January 2025Show evidence

    National Horticulture Board Operational Guidelines JANUARY 2025 (NHB Operational Guidelines, January 2025)

    National Horticulture Board, Ministry of Agriculture & Farmers Welfare, Government of India (Plot No. 85, Sector-18, Institutional Area, Gurugram 122015)

    Printed January 2025

    Chapter 02, Scheme No. 01, cost norms table, item 1 (vi) (PDF p.17, printed page 7). Item column, verbatim: "Integrated Mushroom Production Unit in project mode". Cost norms column, verbatim: "As per NHB norms for a minimum installed capacity above 50 MT and upto 300 MT in…Read the full clause
    Chapter 02, Scheme No. 01, cost norms table, item 1 (vi) (PDF p.17, printed page 7). Item column, verbatim: "Integrated Mushroom Production Unit in project mode". Cost norms column, verbatim: "As per NHB norms for a minimum installed capacity above 50 MT and upto 300 MT in controlled conditions @ Rs. 75000/MT without canning and @ Rs. 85000/ MT with Canning including Production Unit + Compost making Unit." Pattern of assistance column, verbatim: "Credit linked subsidy @ 40% of eligible project cost in General area and @ 50% of eligible project cost for NER and Himalayan States, Scheduled Areas and UTs of Andaman &Nicobar Islands, Lakshadweep Islands, Jammu & Kashmir and Ladakh." Those two percentages were cut to 35% and 45% by NHB's Public Circular of 21 August 2026, cited separately on every rate this record publishes. Read with Chapter 04, Important Instructions, item 16 (PDF p.51, printed page 40), verbatim: "In case of cold storage/CA storage, Mushroom, Ripening chamber, Reefer Van, Cold room and Pre-cooling unit, the EPC is worked out on the basis of capacity." Chapter 01 dates the whole instrument: "The Scheme guidelines shall be effective from 01.01.2025."

    PDF p.17 (Chapter 02, item 1(vi)); PDF p.51 (Chapter 04, instruction 16); PDF p.14 (Chapter 01, "Date of Coming into force")

    Read on 14 September 2026 by chirag.

    Verified against the primary government document.

    See all 2 items NHB Scheme No. 1 prices
  • PMFMENothing for mushroom

    Read end to end against its primary document: it funds nothing for mushroom cultivation. That is a finding, not a gap.

    Verified against the primary government document.

  • AIFHelp on a loan, not a grant

    What this pays is an ongoing rate against loan repayments rather than a sum towards the build, so there is no single figure to show here. The rates are on its own page.

    Verified against the primary government document.

    See all 2 items AIF prices
  • NABARDNot read yet

    We have not yet read a primary document we can publish a rate against, so this atlas publishes none for it.

    Pending. We have not read a primary document for this yet. We do not publish unverified rates.

  • PMKSY Cold ChainNothing for mushroom

    Read end to end against its primary document: it funds nothing for mushroom cultivation. That is a finding, not a gap.

    Verified against the primary government document.

  • SMAM₹2.40 lakh

    At most, for its biggest single item: The same packing-machine financing, at the general-beneficiary rate.

    Private applicant, Andaman & Nicobar / Lakshadweep, 40%.

    SMAM Operational Guidelines 2024Printed 2024Show evidence

    SUB-MISSION ON AGRICULTURAL MECHANIZATION (SMAM) OPERATIONAL GUIDELINES - 2024 (SMAM Operational Guidelines 2024)

    Ministry of Agriculture and Farmers Welfare, Department of Agriculture & Farmers Welfare, Government of India

    Printed 2024

    Covering letter (PDF p.1), verified against pg-01.png, verbatim: "F.No.3-4/2020-M&T(I&P) (81291), Government of India, Ministry of Agriculture & Farmers Welfare, (Department of Agriculture & Farmers welfare), (Mechanization & Technology Division), Krishi Bhawan, New Delhi,…Read the full clause
    Covering letter (PDF p.1), verified against pg-01.png, verbatim: "F.No.3-4/2020-M&T(I&P) (81291), Government of India, Ministry of Agriculture & Farmers Welfare, (Department of Agriculture & Farmers welfare), (Mechanization & Technology Division), Krishi Bhawan, New Delhi, Dated: 7th November, 2024 — Subject: Revision in the Operational Guidelines of Sub Mission on Agricultural Mechanization under the umbrella of Rashtriya Krishi Vikas Yojana... The guidelines have been revised by inclusion of provisions for financial assistance for the FRA Patta holders beneficiaries." Section 5.1 (PDF p.11), Table of Contents entry and body text both read "Demonstration of newly developed agricultural/ horticultural/ crop residue management machines post-harvest technologies...", explicit confirmation the scheme's scope spans horticulture, not just field-crop agriculture, even though no individual crop (mushroom included) is ever named. See the noMushroomComponent-style finding recorded on the scheme (below) and the per-rule clauses for where the actual computable rates come from (Annexure-I, not Section 5.1, which funds institutional demonstration grants, not individual farmer purchases).

    PDF p.1 (covering letter); p.2 (cover); p.11 (§5.1); p.6 (§4.1); p.20 onward (Annexure-I); p.33 (items q/r/t cited on the rules)

    Read on 11 September 2026 by chirag.

    Verified against the primary government document.

    See all 6 items SMAM prices
  • PM-RKVYNot read yet

    We have not yet read a primary document we can publish a rate against, so this atlas publishes none for it.

    Pending. We have not read a primary document for this yet. We do not publish unverified rates.

What to do next

Work out what your own project would draw.

What you actually draw in Andaman & Nicobar Islands depends on what you build and what it costs. The calculator asks where you are, what you are building and what it costs, then prices every scheme on this site against that, shows the document behind each figure, and writes a link you can send to your bank.

Open the calculator

Or have MushroomWale build it.

MushroomWale designs and builds mushroom farms. For the farms we build, we also prepare and pursue the claim: the DPR, the documents, the bank, the sanctioning department and the joint inspection.

We prepare and pursue the claim only for farms we build.

Talk to MushroomWale about building it