Skip to content

State

Mushroom subsidy in Arunachal Pradesh

The most a mushroom growing unit draws in Arunachal Pradesh

₹114.75 lakh

The same integrated mushroom unit where the project includes canning, priced at the higher of the two per-tonne norms the clause states.

Paid by NHB Scheme No. 1.

Enhanced rate, NE & Himalayan State, 45%. You reach that only by building all the way to the scheme’s own limit of 300 MT of installed capacity, which the scheme costs at ₹255.00 lakh. A smaller project draws proportionally less.

Your project must be bigger than 50 MT of installed capacity to qualify at all. Below that it pays nothing at all, not simply less.

Type
State
Which rate applies
NE & Himalayan State
Schemes that apply
9
NHB Operational Guidelines, January 2025Printed January 2025Show the clause, the page and our archived copy
Printed in the document as “1 (vi) Integrated Mushroom Production Unit in project mode, with canning”.

National Horticulture Board Operational Guidelines JANUARY 2025 (NHB Operational Guidelines, January 2025)

National Horticulture Board, Ministry of Agriculture & Farmers Welfare, Government of India (Plot No. 85, Sector-18, Institutional Area, Gurugram 122015)

Printed January 2025

Chapter 02, Scheme No. 01, cost norms table, item 1 (vi) (PDF p.17, printed page 7). Item column, verbatim: "Integrated Mushroom Production Unit in project mode". Cost norms column, verbatim: "As per NHB norms for a minimum installed capacity above 50 MT and upto 300 MT in…Read the full clause
Chapter 02, Scheme No. 01, cost norms table, item 1 (vi) (PDF p.17, printed page 7). Item column, verbatim: "Integrated Mushroom Production Unit in project mode". Cost norms column, verbatim: "As per NHB norms for a minimum installed capacity above 50 MT and upto 300 MT in controlled conditions @ Rs. 75000/MT without canning and @ Rs. 85000/ MT with Canning including Production Unit + Compost making Unit." Pattern of assistance column, verbatim: "Credit linked subsidy @ 40% of eligible project cost in General area and @ 50% of eligible project cost for NER and Himalayan States, Scheduled Areas and UTs of Andaman &Nicobar Islands, Lakshadweep Islands, Jammu & Kashmir and Ladakh." Those two percentages were cut to 35% and 45% by NHB's Public Circular of 21 August 2026, cited separately on every rate this record publishes. Read with Chapter 04, Important Instructions, item 16 (PDF p.51, printed page 40), verbatim: "In case of cold storage/CA storage, Mushroom, Ripening chamber, Reefer Van, Cold room and Pre-cooling unit, the EPC is worked out on the basis of capacity." Chapter 01 dates the whole instrument: "The Scheme guidelines shall be effective from 01.01.2025."

PDF p.17 (Chapter 02, item 1(vi)); PDF p.51 (Chapter 04, instruction 16); PDF p.14 (Chapter 01, "Date of Coming into force")

Read on 14 September 2026 by chirag.

The most any one of the 9 schemes that apply here pays for the growing rooms themselves, never a total of them. The growing rooms are not all these schemes fund: see what else they price.

Arunachal Pradesh counts as an NE & Himalayan State, so the central schemes pay a higher share here: 50% of what a scheme assumes an item costs, instead of the usual 40%, on the items that carry the higher rate. Arunachal Pradesh’s own scheme is verified: it funds mushroom cultivation at prices it does not set itself, which are MIDH's, though we could not confirm from the document that the scheme is still running.

See how these schemes actually work for the myths, limits and loopholes behind every figure.

What decides whether you get anything

These are the conditions NHB Scheme No. 1 carries, the scheme behind the figure above. Each of the other schemes on this page carries its own, set out on its own page.

Does this need a bank loan? (credit linked)
Yes. The subsidy rides on a bank loan: a bank sanctions the loan and the subsidy is adjusted against it.
When does the money arrive? (back ended)
After you build, and after an inspection. The subsidy is held in a reserve account and released once the project has been inspected and found complete, not paid up front.
Must it be approved before you start work? (sanction before commencement)
Sanction before commencement applies. The approving authority must issue its sanction before eligible expenditure is incurred. Read what starting work early costs you.

Arunachal Pradesh’s own scheme

Arunachal Pradesh's HMNEH/MIDH mushroom component

Department of Horticulture, Government of Arunachal Pradesh (Director (Hort.), Chimpu, Naharlagun 791110)

Verified. Read on 13 September 2026, against the primary government document. We could not confirm the scheme is still running, so check with the department before you rely on it.

Read end to end against its primary document. It funds mushroom cultivation without setting a rate of its own for it: the cost norms are MIDH’s, which this atlas publishes in full.

What we read, and why we cannot confirm it is still currentRead the full note

Arunachal Pradesh, VERIFIED 2026-09-13, from the Government of India rather than from the State, because the State has no website to read. Across three passes this project has found the Department of Horticulture unreachable under two different domains: one serves a bare directory listing over https and cPanel's "this domain is not configured" placeholder over http, and the other has no DNS record at all. That is still true. What has changed is that the department's own approved plan does not have to come from the department.

The document is the approval of Arunachal's Annual Action Plan under the Horticulture Mission for North East and Himalayan States, and it opens with the signed letter: F.No. 33-28/2016-MIDH (AAP), Horticulture Division, Krishi Bhawan, dated 01st July 2016, sent by Speed Post to the "Director (Hort.), Department of Horticulture, Government of Arunachal Pradesh, Chimpu, Naharlagun, Arunachal Pradesh: 791110". That address is worth as much as the figures: it is a current, named, physical office for a department with no working web presence at all, which for a grower here is the difference between a dead end and somewhere to walk in with a question. The letter approves implementation of HMNEH under MIDH in the State during 2016-17 at an outlay of Rs 5,755.2 lakh, split 90% Government of India to 10% State, and binds that spending at its Term II: "Expenditure on approved activities shall be in conformity with the norms laid down in the operational guidelines of the scheme."

WHAT THE APPROVED TABLE PRINTS, AND WHY NO RULE IS RECORDED FROM IT. The plan funds mushrooms that year, and only one of the three components: a production unit, public sector, two units, Rs 40.00 lakh, under a column headed "Maximum permissible cost" entering "Rs. 20.00 lakh/ unit" at "100% of the cost." No spawn making unit and no compost making unit appear anywhere in the 2016-17 table. That Rs 20.00 lakh is the superseded CENTRAL norm, not an Arunachal figure; the current central guideline prices the same component at Rs 30 lakh, and this atlas sets out the whole of that under "The Rs 20 lakh figure is the old central one" in How it works. Recording it here as Arunachal's own schedule would invent a state rate out of a central one, so no rule is recorded at that figure, and none at the current central figure either: Term II binds this plan to the guidelines as they stood in 2016, and a 2016 letter cannot speak for what an application is assessed against a decade later.

A DISCREPANCY WORTH SEEING, LEFT UNRESOLVED. The plan's private-sector row prints assistance at 40% of cost, the general-areas rate. The central guideline in force gives North Eastern and Himalayan States 50% on this component, and Arunachal is one of them. So the approved plan and the current central guideline do not agree about what a private mushroom applicant in this State draws. This record says what the approved plan says, names the disagreement, and does not settle it by inference in either direction. The central guideline's own area-class treatment is published on this site with its own evidence, and it is the document to take to the department.

ANOTHER, INSIDE THE SAME FILE. The plan's summary sheet enters the mushroom row's physical target as 0 while carrying the full Rs 40.00 lakh outlay beside it; the detail sheet, five pages later, enters 2.0 units against the identical Rs 40.00 lakh. Both are printed in the same approved document. The figure used here is the detail sheet's, because it is the sheet that names the component, the sector and the cost norm; the summary sheet's 0 is recorded rather than quietly dropped.

THE MONEY WAS REAL, AND SOMEONE AUDITED IT. The Comptroller and Auditor General's compliance audit of Arunachal Pradesh for the year ended 31 March 2020 says the same thing about which scheme is running here, in its own words and from outside both governments: "MIDH is a centrally sponsored Scheme for the holistic growth of the horticulture sector covering fruits, vegetables, roots & tuber crops, mushrooms, spices, flowers, aromatic plants, coconut, cashew, cocoa and Bamboo. Under MIDH, 'Horticulture Mission for North East & Himalayan States (HMNEH)' is one of the sub-schemes implemented in the State." It then records, at its paragraph on activities under Post Harvest Management, that the State Horticulture Mission released Rs 111.75 lakh to a bank in March 2019 for three beneficiaries, itemised in its own footnote as Rs 90.00 lakh for a cold storage at Ziro, Rs 8.00 lakh for a mushroom shed at Sille (Pasighat) and Rs 13.75 lakh for a spice production unit at Namsai, all "under credit linked back ended subsidy". So mushroom money has actually moved here, to a named project, under MIDH's own machinery. That Rs 8.00 lakh is NOT recorded as a rate and must never be: it is a reported disbursement under audit for irregularity, and the very same paragraph shows why the distinction matters, printing both figures for the cold storage beside it and finding that the Rs 90.00 lakh released was more than eleven times the Rs 8.00 lakh the norm allowed. An audited disbursement is evidence that a component exists and is funded. It is not evidence of what it is worth.

WHY THE STATUS IS "unknown" RATHER THAN ACTIVE. The anchor plan is from 2016-17, ten years back. The component is still in the State's plan format in 2021-22, printed across all three rows with the same cost norms, but allocated nothing at all; by 2022-23 the heading survives with a nil sub-total and the rows themselves are gone. Two of the plans read here therefore show the component present and unfunded, and the one that funds it is a decade old. The years in between were not read for this record. The research pass that assembled these documents reports that the 2017-18, 2019-20 and 2020-21 plans are image-only scans in which an OCR sweep surfaced no mushroom row; OCR silence over a scan is far too weak to publish as an absence, and nothing here treats it as one. What those years did is simply not established.

WHERE THE LIVE COPY WENT. midh.gov.in no longer serves these plans: the site is now an Angular application, and the exact URL above answers with HTTP 200 and 25,176 bytes of HTML shell titled "MIDH-Suraksha" instead of a PDF. Verified directly on this URL during this pass, and on two others. A fetcher that checks only the status code will record this document as live. It is not; every copy cited here was recovered from the Internet Archive and its digest re-verified against the capture it came from.

THE DEPARTMENT ITSELF, still unreachable, recorded because a reader may try where we did. horticulture.arunachal.gov.in fails its TLS handshake, and forcing past that returns an Apache directory index with two entries and no site behind it; over plain http the same host redirects to cPanel's stock unconfigured-domain page, which settles it, there is no content behind either protocol. arunhorticulture.nic.in, the domain the State's own agriculture portal still links Horticulture to, has no DNS record whatsoever. The Internet Archive shows arunhorticulture.nic.in was a real working site until 2022, and its own schemes page named "Mushroom production units" among the items its area-expansion programme funded, "implemented by the department of Horticulture as per central guideline and Annual Action Plan approved by SFAC", the same relationship this record now has a signed instrument for, written on the department's own long-dead page. Its guidelines and circulars pages were empty placeholders reading "Contents will be updated soon", and no scheme PDF of any kind was ever captured on that domain. The State's live agriculture portal, agri.arunachal.gov.in, is a genuine current site whose scheme listing carries thirteen dated 2026 documents and no mushroom mention: it is Agriculture, not Horticulture, and the two are separate departments here.

Central schemes that apply in Arunachal Pradesh

These apply everywhere in India; what changes from state to state is the share they pay. Each line shows the most that scheme pays for any one item at Arunachal Pradesh’s rate, and the document it comes from. Between them they also fund a compost yard, a spawn laboratory, a pack house and processing, a cold store, help with loan interest, a credit guarantee and machinery, each at its own rate.

MIDH Operational Guidelines 2025, Annexure V, Item III lists "NE & Himalayan States" among the enhanced-rate areas, defined by its footnote only as "States in North East & Himalayan region covered under HMNEH scheme." That HMNEH enumeration was located at the official HMNEH / TMNEHS scheme portal (Department of Agriculture & Cooperation, Government of India), https://tmnehs.gov.in/, read 11 Sep 2026, archived at content/sources/hmneh-coverage.html (SHA-256 e0193eb29563c36a8c8f69b41299b8f99941e06257a24cea4aa7d68c5d1f9086), which states verbatim: "The mission covers all NE States including Sikkim and three Himalayan states of Jammu & Kashmir, Himachal Pradesh and Uttarakhand." CAVEAT, read before relying on this for a claim: this is a live government page, not an abandoned one, its own footer reads "Last Updated On :17/10/2019" (17 October 2019, verified directly against the archived file), roughly two years after its "What's New" bulletins end (which run only through 2017-18; an earlier version of this note wrongly read that gap, plus the page's boilerplate "© 2010" copyright line, as the whole page being frozen and untouched since, the copyright year is a static template value on this class of government site and does not track content updates). That October 2019 update is still before the Jammu & Kashmir Reorganisation Act, 2019 took effect (31 October 2019, the "appointed day" that split the erstwhile state into the Union Territories of Jammu & Kashmir and Ladakh), and the page's own text still reads "Jammu & Kashmir" as the pre-2019 undivided state, so it still does not speak to how J&K (UT) and Ladakh (UT) are separately treated today, just not because the page was abandoned. See LADAKH_NOTE for how that gap is handled for Ladakh.
  • MIDH₹300.00 lakh

    At most, for its biggest single item: The same Cold Storage Type-I, built instead as a pre-engineered building (PEB) frame combined with civil work and PUF/PIR panels, priced per tonne of storage capacity up to 5,000 MT, at a higher per-MT rate than the plain-civil row.

    Enhanced rate, NE & Himalayan State, 50%.

    MIDH Operational Guidelines 2025Printed 31 December 2024Show evidence

    OPERATIONAL GUIDELINES MISSION FOR INTEGRATED DEVELOPMET OF HORTICULTURE (MIDH Operational Guidelines 2025)

    Department of Agriculture & Farmers Welfare, Government of India (published on nhb.gov.in)

    Printed 31 December 2024

    Annexure V, Item C.7 "Cold Storage Type-I (CS-1)", row (ii), verbatim: "Cold Storage Type-I is defined as CS-1 with Construction in combination of civil & PEB including PUF/PIR panels, Doors and Ante-rooms, Refrigeration Units, Electrical Installation, Administrative block,…Read the full clause
    Annexure V, Item C.7 "Cold Storage Type-I (CS-1)", row (ii), verbatim: "Cold Storage Type-I is defined as CS-1 with Construction in combination of civil & PEB including PUF/PIR panels, Doors and Ante-rooms, Refrigeration Units, Electrical Installation, Administrative block, Safety/Fire Safety and Hazard control and basic mezzanine structure." Cost Norms column, verbatim: "Rs. 12000/MT, (Max 5,000 MT capacity)." Pattern of Assistance column, verbatim: "Credit linked back-ended assistance @ 35% in General areas and 50% in the case of NE & Himalayan States, Scheduled areas, vibrant villages, Andaman & Nicobar and Lakshadweep Islands." plus "Note: Component has to be implemented in accordance to NCCD guidelines only."

    PDF p.66

    Read on 11 September 2026 by chirag.

    Verified against the primary government document.

    See all 8 items MIDH prices
  • NHB Scheme No. 1₹114.75 lakh

    At most, for its biggest single item: The same integrated mushroom unit where the project includes canning, priced at the higher of the two per-tonne norms the clause states.

    Enhanced rate, NE & Himalayan State, 45%.

    NHB Operational Guidelines, January 2025Printed January 2025Show evidence

    National Horticulture Board Operational Guidelines JANUARY 2025 (NHB Operational Guidelines, January 2025)

    National Horticulture Board, Ministry of Agriculture & Farmers Welfare, Government of India (Plot No. 85, Sector-18, Institutional Area, Gurugram 122015)

    Printed January 2025

    Chapter 02, Scheme No. 01, cost norms table, item 1 (vi) (PDF p.17, printed page 7). Item column, verbatim: "Integrated Mushroom Production Unit in project mode". Cost norms column, verbatim: "As per NHB norms for a minimum installed capacity above 50 MT and upto 300 MT in…Read the full clause
    Chapter 02, Scheme No. 01, cost norms table, item 1 (vi) (PDF p.17, printed page 7). Item column, verbatim: "Integrated Mushroom Production Unit in project mode". Cost norms column, verbatim: "As per NHB norms for a minimum installed capacity above 50 MT and upto 300 MT in controlled conditions @ Rs. 75000/MT without canning and @ Rs. 85000/ MT with Canning including Production Unit + Compost making Unit." Pattern of assistance column, verbatim: "Credit linked subsidy @ 40% of eligible project cost in General area and @ 50% of eligible project cost for NER and Himalayan States, Scheduled Areas and UTs of Andaman &Nicobar Islands, Lakshadweep Islands, Jammu & Kashmir and Ladakh." Those two percentages were cut to 35% and 45% by NHB's Public Circular of 21 August 2026, cited separately on every rate this record publishes. Read with Chapter 04, Important Instructions, item 16 (PDF p.51, printed page 40), verbatim: "In case of cold storage/CA storage, Mushroom, Ripening chamber, Reefer Van, Cold room and Pre-cooling unit, the EPC is worked out on the basis of capacity." Chapter 01 dates the whole instrument: "The Scheme guidelines shall be effective from 01.01.2025."

    PDF p.17 (Chapter 02, item 1(vi)); PDF p.51 (Chapter 04, instruction 16); PDF p.14 (Chapter 01, "Date of Coming into force")

    Read on 14 September 2026 by chirag.

    Verified against the primary government document.

    See all 2 items NHB Scheme No. 1 prices
  • PMFMENothing for mushroom

    Read end to end against its primary document: it funds nothing for mushroom cultivation. That is a finding, not a gap.

    Verified against the primary government document.

  • AIFHelp on a loan, not a grant

    What this pays is an ongoing rate against loan repayments rather than a sum towards the build, so there is no single figure to show here. The rates are on its own page.

    Verified against the primary government document.

    See all 2 items AIF prices
  • NABARDNot read yet

    We have not yet read a primary document we can publish a rate against, so this atlas publishes none for it.

    Pending. We have not read a primary document for this yet. We do not publish unverified rates.

  • PMKSY Cold ChainNothing for mushroom

    Read end to end against its primary document: it funds nothing for mushroom cultivation. That is a finding, not a gap.

    Verified against the primary government document.

  • SMAM₹2.40 lakh

    At most, for its biggest single item: The same packing-machine financing, at the general-beneficiary rate.

    Private applicant, NE & Himalayan State, 40%.

    SMAM Operational Guidelines 2024Printed 2024Show evidence

    SUB-MISSION ON AGRICULTURAL MECHANIZATION (SMAM) OPERATIONAL GUIDELINES - 2024 (SMAM Operational Guidelines 2024)

    Ministry of Agriculture and Farmers Welfare, Department of Agriculture & Farmers Welfare, Government of India

    Printed 2024

    Covering letter (PDF p.1), verified against pg-01.png, verbatim: "F.No.3-4/2020-M&T(I&P) (81291), Government of India, Ministry of Agriculture & Farmers Welfare, (Department of Agriculture & Farmers welfare), (Mechanization & Technology Division), Krishi Bhawan, New Delhi,…Read the full clause
    Covering letter (PDF p.1), verified against pg-01.png, verbatim: "F.No.3-4/2020-M&T(I&P) (81291), Government of India, Ministry of Agriculture & Farmers Welfare, (Department of Agriculture & Farmers welfare), (Mechanization & Technology Division), Krishi Bhawan, New Delhi, Dated: 7th November, 2024 — Subject: Revision in the Operational Guidelines of Sub Mission on Agricultural Mechanization under the umbrella of Rashtriya Krishi Vikas Yojana... The guidelines have been revised by inclusion of provisions for financial assistance for the FRA Patta holders beneficiaries." Section 5.1 (PDF p.11), Table of Contents entry and body text both read "Demonstration of newly developed agricultural/ horticultural/ crop residue management machines post-harvest technologies...", explicit confirmation the scheme's scope spans horticulture, not just field-crop agriculture, even though no individual crop (mushroom included) is ever named. See the noMushroomComponent-style finding recorded on the scheme (below) and the per-rule clauses for where the actual computable rates come from (Annexure-I, not Section 5.1, which funds institutional demonstration grants, not individual farmer purchases).

    PDF p.1 (covering letter); p.2 (cover); p.11 (§5.1); p.6 (§4.1); p.20 onward (Annexure-I); p.33 (items q/r/t cited on the rules)

    Read on 11 September 2026 by chirag.

    Verified against the primary government document.

    See all 6 items SMAM prices
  • PM-RKVYNot read yet

    We have not yet read a primary document we can publish a rate against, so this atlas publishes none for it.

    Pending. We have not read a primary document for this yet. We do not publish unverified rates.

What to do next

Work out what your own project would draw.

What you actually draw in Arunachal Pradesh depends on what you build and what it costs. The calculator asks where you are, what you are building and what it costs, then prices every scheme on this site against that, shows the document behind each figure, and writes a link you can send to your bank.

Open the calculator

Or have MushroomWale build it.

MushroomWale designs and builds mushroom farms. For the farms we build, we also prepare and pursue the claim: the DPR, the documents, the bank, the sanctioning department and the joint inspection.

We prepare and pursue the claim only for farms we build.

Talk to MushroomWale about building it