Published as “Arunachal Pradesh, mushroom cultivation under HMNEH/MIDH, at cost norms the State does not set”, Department of Horticulture, Government of Arunachal Pradesh (Director (Hort.), Chimpu, Naharlagun 791110).
Arunachal Pradesh's HMNEH/MIDH mushroom component is Arunachal Pradesh’s own scheme, administered by Department of Horticulture, Government of Arunachal Pradesh (Director (Hort.), Chimpu, Naharlagun 791110). It is verified against a primary document which funds mushroom cultivation and sets no rate of its own for it: the cost norms are MIDH's.
What it pays for
This document funds mushroom cultivation and sets no rate of its own for it, so this page publishes none. The figures you want are MIDH’s.
What it pays for
Read end to end against its primary document. Arunachal Pradesh's HMNEH/MIDH mushroom component is real and funded, and the document that approves it sets no rate for it: it says the cost norms are the scheme’s own. So the figures you want are MIDH’s, published in full on this site with their own evidence. That is a finding, not a gap: the document beside this text is why.
Who can claim it
No applicant class is priced under this scheme. See What it pays for, above, for why.
The conditions
- Does this need a bank loan? (credit linked)
- Yes. The subsidy rides on a bank loan: a bank sanctions the loan and the subsidy is adjusted against it.
- When does the money arrive? (back ended)
- After you build, and after an inspection. The subsidy is held in a reserve account and released once the project has been inspected and found complete, not paid up front.
- Must it be approved before you start work? (sanction before commencement)
- We searched this document for a clause requiring sanction before you start work and did not find one. That is not the same as there being no such rule: it may sit in a document we have not read. Confirm with your sanctioning department and your bank before committing spend. Read why we will not resolve this either way.
Claiming this alongside another scheme
Checked against every other scheme this atlas holds. For most pairs no document says anything either way, and this page says so rather than guessing.
Read against 43 other schemes: 1 excluded, 42 unconfirmed.
Excluded
MIDH Excluded alongside MIDH.
This record and MIDH are not two schemes, they are one. The approval letter is the Government of India authorising Arunachal Pradesh to implement HMNEH under MIDH, and binding the spending to the…Read the rest of the reasoning
This record and MIDH are not two schemes, they are one. The approval letter is the Government of India authorising Arunachal Pradesh to implement HMNEH under MIDH, and binding the spending to the scheme's own norms. Marked 'excluded' so an Arunachal applicant is never shown a state entitlement and a central one as two separate sums for the same growing room. Note that the approved plan and the current central guideline disagree about the private-sector rate in this State (40% against 50%); that is set out in this record's own note, and how MIDH itself treats an NE and Himalayan State is the concern of MIDH's own record on this site, not of this one.
Unconfirmed
For most pairs of schemes, this reading found nothing in either document that says how the two combine.
Neither guideline addresses this combination. Confirm with the department before you rely on it.
Central schemes
State and union territory schemes
- AP MIDH Guidelines (Mushroom)
- Assam Horticulture Dept.
- Bihar Mushroom Kit & Hut Scheme
- CT MIDH Mushroom Component
- GA Farmer Handbook (Mushroom)
- GJ Scheme for Mushroom Cultivation
- HR MIDH/NHM Mushroom (adopted by reference)
- HP Khumb Vikas Yojna
- Jharkhand's MIDH mushroom component
- KA MIDH Guidelines (Mushroom)
- KL SHM Mushroom (MIDH + RKVY)
- MP MIDH Mushroom Component
- MH Mushroom Guidance Note
- Manipur Horticulture Dept.
- Meghalaya Mushroom Mission
- Mizoram Horticulture Dept.
- Nagaland Horticulture Dept.
- Odisha Mushroom Mission (WSHG)
- Punjab's MIDH mushroom component
- RJ NHM Guideline (Mushroom)
- Sikkim Horticulture Dept.
- TN MIDH-NHM Mushroom (women)
- TG MIDH Guidelines (Mushroom)
- TR SHM MIDH Cost Norms (Mushroom)
- UP NHM/MIDH Mushroom (2015-16, archived)
- UK HMNEH Mushroom Production
- West Bengal's MIDH mushroom component
- A&N Dept. of Agriculture
- Chandigarh Agriculture Dept.
- DNH&DD Agriculture Dept.
- Delhi Development Department
- J&K Horticulture/Agriculture Depts.
- Ladakh Horticulture Dept.
- Lakshadweep Agriculture Dept.
- Puducherry's NHM/MIDH mushroom component
The document
Implementation of Horticulture Mission for North East and Himalayan States (HMNEH) under MIDH programme-Approval of Annual Action Plan (AAP) 2015-16-regarding. (Government of India approval of Arunachal Pradesh's HMNEH/MIDH Annual Action Plan 2016-17, with the approved component table (recovered from the Internet Archive))
Horticulture Division, Department of Agriculture, Cooperation & Farmers Welfare, Ministry of Agriculture & Farmers Welfare, Government of India (Krishi Bhawan, New Delhi)
Printed 1 July 2016
“Approval letter, F.No. 33-28/2016-MIDH (AAP), marked "By Speed Post", dated 01st July 2016, addressed to the "Director (Hort.), Department of Horticulture, Government of Arunachal Pradesh, Chimpu, Naharlagun, Arunachal Pradesh: 791110". Its subject line reads "...Approval of…”Read the full clause
“Approval letter, F.No. 33-28/2016-MIDH (AAP), marked "By Speed Post", dated 01st July 2016, addressed to the "Director (Hort.), Department of Horticulture, Government of Arunachal Pradesh, Chimpu, Naharlagun, Arunachal Pradesh: 791110". Its subject line reads "...Approval of Annual Action Plan (AAP) 2015-16-regarding." while its own body, outlay table and every enclosed sheet read 2016-17; the subject line is reproduced verbatim as this document's title above, and the year used throughout is 2016-17, the document's own. Term II, verbatim: "Expenditure on approved activities shall be in conformity with the norms laid down in the operational guidelines of the scheme." Total outlay Rs 5,755.2 lakh, GOI Share 90% and State Share 10%. The enclosed sheet "Component wise details for Physical Target and Financial outlay approved for implementation of NHM Programmes during 2016-17" carries, at item "Mushrooms", a single component: "Production unit", "Public Sector", "Rs. 20.00 lakh/ unit" under the column "Maximum permissible cost", "100% of the cost.", Phy Target 2.0, Fin. Outlay 40.00, GOI Share 36.00, State Share 4.00; the "Private Sector" row beneath it prints "Rs. 20.00 lakh/ unit" and "40% of cost for private sector, for meeting the expenditure on infrastructure, as credit linked back ended subsidy." at 0.00. No spawn making unit or compost making unit row appears. The plan's own summary sheet enters this row's physical target as 0 against the same 40.0 outlay, disagreeing with the detail sheet's 2.0. CITED FOR WHICH SCHEME PRICES THIS COMPONENT, NEVER FOR THE Rs 20 LAKH: that is the superseded central norm, not an Arunachal schedule, and the current central guideline prices the same component at Rs 30 lakh. Note also that this plan gives the private rate as 40%, the general-areas rate, where the current central guideline gives North Eastern and Himalayan States 50% on this component; the disagreement is recorded, not resolved. This file is an image-only scan with no text layer, so every figure above was read from rendered page images; OCR of the same page misreads the physical target as "20". Recovered from the Internet Archive at https://web.archive.org/web/20240226074337id_/https://midh.gov.in/HMNEH/2016-17/Arunachal%20Pradesh%202016-17.pdf (capture timestamp 2024-02-26) because the live URL no longer serves the file: midh.gov.in now answers it with 25,176 bytes of Angular application shell titled "MIDH-Suraksha", at HTTP 200. Companions archived alongside: content/sources/state-ar-2026-hmneh-aap-2021-22.pdf (capture timestamp 2024-02-16), the same three components printed at the same cost norms with every cell nil; and content/sources/state-ar-2026-cag-report2-2022-ch3-economic.pdf, the Comptroller and Auditor General's compliance audit for the year ended 31 March 2020, for the Rs 8.00 lakh released in March 2019 for a mushroom shed at Sille (Pasighat), a disbursement under audit, never a rate.”
PDF pp.1-2 (approval letter: printed date, addressee and Term II on p.1); PDF p.4 (summary sheet, row 4 "Mushrooms"); PDF p.5 (the detail sheet's column headings); PDF p.7 (item "Mushrooms", the production unit rows).
Read on 13 September 2026 by chirag.
What to do next
Work out what your own project would draw.
What Arunachal Pradesh's HMNEH/MIDH mushroom component pays you depends on your own state, size and cost. The calculator asks where you are, what you are building and what it costs, then prices every scheme on this site against that, shows the document behind each figure, and writes a link you can send to your bank.
Or have MushroomWale build it.
MushroomWale designs and builds mushroom farms. For the farms we build, we also prepare and pursue the claim: the DPR, the documents, the bank, the sanctioning department and the joint inspection.
We prepare and pursue the claim only for farms we build.