The most a mushroom growing unit draws in Meghalaya

₹114.75 lakh

The same integrated mushroom unit where the project includes canning, priced at the higher of the two per-tonne norms the clause states.

Paid by NHB Scheme No. 1.

Enhanced rate, NE & Himalayan State, 45%. You reach that only by building all the way to the scheme’s own limit of 300 MT of installed capacity, which the scheme costs at ₹255.00 lakh. A smaller project draws proportionally less.

Your project must be bigger than 50 MT of installed capacity to qualify at all. Below that it pays nothing at all, not simply less.

Type
State
Which rate applies
NE & Himalayan State
Schemes that apply
9
NHB Operational Guidelines, January 2025Printed January 2025Show the clause, the page and our archived copy
Printed in the document as “1 (vi) Integrated Mushroom Production Unit in project mode, with canning”.

National Horticulture Board Operational Guidelines JANUARY 2025 (NHB Operational Guidelines, January 2025)

National Horticulture Board, Ministry of Agriculture & Farmers Welfare, Government of India (Plot No. 85, Sector-18, Institutional Area, Gurugram 122015)

Printed January 2025

Chapter 02, Scheme No. 01, cost norms table, item 1 (vi) (PDF p.17, printed page 7). Item column, verbatim: "Integrated Mushroom Production Unit in project mode". Cost norms column, verbatim: "As per NHB norms for a minimum installed capacity above 50 MT and upto 300 MT in…Read the full clause
Chapter 02, Scheme No. 01, cost norms table, item 1 (vi) (PDF p.17, printed page 7). Item column, verbatim: "Integrated Mushroom Production Unit in project mode". Cost norms column, verbatim: "As per NHB norms for a minimum installed capacity above 50 MT and upto 300 MT in controlled conditions @ Rs. 75000/MT without canning and @ Rs. 85000/ MT with Canning including Production Unit + Compost making Unit." Pattern of assistance column, verbatim: "Credit linked subsidy @ 40% of eligible project cost in General area and @ 50% of eligible project cost for NER and Himalayan States, Scheduled Areas and UTs of Andaman &Nicobar Islands, Lakshadweep Islands, Jammu & Kashmir and Ladakh." Those two percentages were cut to 35% and 45% by NHB's Public Circular of 21 August 2026, cited separately on every rate this record publishes. Read with Chapter 04, Important Instructions, item 16 (PDF p.51, printed page 40), verbatim: "In case of cold storage/CA storage, Mushroom, Ripening chamber, Reefer Van, Cold room and Pre-cooling unit, the EPC is worked out on the basis of capacity." Chapter 01 dates the whole instrument: "The Scheme guidelines shall be effective from 01.01.2025."

PDF p.17 (Chapter 02, item 1(vi)); PDF p.51 (Chapter 04, instruction 16); PDF p.14 (Chapter 01, "Date of Coming into force")

Read on 14 September 2026 by chirag.

The most any one of the 9 schemes that apply here pays for the growing rooms themselves, never a total of them. The growing rooms are not all these schemes fund: see what else they price.

Meghalaya counts as an NE & Himalayan State, so the central schemes pay a higher share here: 50% of what a scheme assumes an item costs, instead of the usual 40%, on the items that carry the higher rate. Meghalaya’s own scheme is verified, with 1 rule for mushroom cultivation, below, though we could not confirm from the document that the scheme is still running.

See how these schemes actually work for the myths, limits and loopholes behind every figure.

What decides whether you get anything

These are the conditions NHB Scheme No. 1 carries, the scheme behind the figure above. Each of the other schemes on this page carries its own, set out on its own page.

Does this need a bank loan? (credit linked)
Yes. The subsidy rides on a bank loan: a bank sanctions the loan and the subsidy is adjusted against it.
When does the money arrive? (back ended)
After you build, and after an inspection. The subsidy is held in a reserve account and released once the project has been inspected and found complete, not paid up front.
Must it be approved before you start work? (sanction before commencement)
Sanction before commencement applies. The approving authority must issue its sanction before eligible expenditure is incurred. Read what starting work early costs you.

Meghalaya’s own scheme

Meghalaya Mushroom Mission

Department of Agriculture, Government of Meghalaya (Directorate of Horticulture)

Verified. Read on 13 September 2026, against the primary government document. We could not confirm the scheme is still running, so check with the department before you rely on it.

Applies nationally, but resolves to no rate for a general applicant in this area.

What we read, and why we cannot confirm it is still currentRead the full note

Meghalaya, SETTLED and verified 2026-09-13. Four prior research passes (see the reconciliation table in state-source-dossier-2.md and the coordinator's 11 Sep 2026 correction) found an undated "Meghalaya Mushroom Mission" document in two diverging, unsigned copies, plus mushroom scheme text inside two FAQ PDFs, and concluded: real, substantial content, but nothing establishing it was ever formally notified or adopted.

THIS PASS found the missing instrument. `meghalaya.gov.in` (the STATE portal, not megagriculture.gov.in, a domain none of the four prior passes checked for this) hosts, under its own `press_release` directory, a formal press release from the GOVERNMENT OF MEGHALAYA, DIRECTORATE OF INFORMATION & PUBLIC RELATIONS (Wayback-recovered, captured 2023-06-24, but the document itself is dated and numbered, see below), titled "Launching of Meghalaya Mushroom Mission": "Press Release No.245/19 ... Shillong, May 30th, 2019: The Department of Agriculture, Meghalaya officially launched the Meghalaya Mushroom Mission at a function held today at the Conference Hall, Main Secretariat building. The function was chaired by Shri. K.N.Kumar, Additional Chief Secretary to the Government of Meghalaya. Smt. Sber Majaw an octogenarian farmer of 95 years old from Law-Sohtun village was the Chief Guest ... and she also released the Meghalaya Mushroom Mission document ... The function also witnessed the signing of a tripartite MOU between the Department of Agriculture, Meghalaya represented by Smt. M.N. Nampui, Secretary Agriculture, Yats Corporation Company Ltd. Japan represented by Col. Ranjit Singh and Hills Farmers' Union, represented by General Secretary, Shri Allfondbirth Kharsyntiew." This is precisely the "notification ... for the Mushroom Mission" this task's brief asked this pass to find: a numbered, dated, government-issued press release describing an official launch ceremony chaired by the Additional Chief Secretary, at which the Mission document was formally released and a tripartite MOU was signed by the Secretary Agriculture. The press release states the Mission's budget as Rs 62.37 crore over five years (Rs 4 crore earmarked for Shiitake), targeting production growth from 27 to 5000 MT/year across 1000 farmers in 7 districts.

SEPARATELY, the department's own official brochure, "MISSION MUSHROOM 2018-2023", issued by the Agriculture Information Wing, Directorate of Agriculture (live-fetched directly from megagriculture.gov.in/PUBLIC/dwd_docs/MissionMushroom.pdf; the Wayback copies of this exact URL are truncated at 1-5MB by the archive's own size cap on a 28.48MB original, confirmed via the `x-archive-orig-x-crawler-content-length` header, so this pass fetched the complete file directly from the live host instead), carries the Government of India emblem, both departmental logos (Department of Agriculture and Directorate of Horticulture), and states its own institutional lineage in its "Introduction": "the cultivation of Mushroom in Meghalaya commenced since 1982 ... a proposal was submitted to the North Eastern Council (NEC) for establishing a Mushroom Centre in Shillong, which was APPROVED AND SANCTIONED during 1982-83, and named as 'The Regional Centre for Training and Cultivation of Mushrooms' ... till the scheme was ABSORBED AS A CONTINUING STATE PLAN SCHEME of the Government of Meghalaya." This brochure gives the Mission's proposed investment as Rs 50 crore for five years across 136 villages (a figure independent of, and close to, but not identical to, the press release's Rs 62.37 crore, likely a later revision; both are genuine official numbers, not a fabrication concern for this record since neither is used as a rule below), funded from MIDH (Government of India), State Government funds, the Meghalaya Livelihood and Access to Market Project (Megh-LAMP), and the German Development Bank KfW, and lists five Mission objectives and four Mini Missions (I: cluster-based cultivation and FPO promotion; II: spawn production infrastructure, four named spawn units, including "Mushroom Development Centre" at 7.2 tons/year; III: capacity building; IV: marketing/value addition/processing).

The department's own live "Crops > Horticulture Crops > Mushrooms" page (megagriculture.gov.in/PUBLIC/crops_mushrooms.aspx, archived alongside, capture history 2013- 2018 unchanged) independently corroborates the same 1982 origin story in its own words: "A Regional Centre for Training and Production of Mushroom in North Eastern Region sponsored by the North Eastern Council was established in February 1982 at the Agricultural Complex, Upper Shillong", a THIRD, independently-worded document agreeing on the same institutional facts.

This settles the authority question: the Meghalaya Mushroom Mission (and its predecessor, the NEC-sanctioned Regional Centre for Training and Production of Mushroom, now a continuing State Plan Scheme) is real, was formally launched at a government ceremony, is centrally co-funded (MIDH) and internationally co-funded (Japan, Germany), and its 1982-83 sanction lineage is independently corroborated across three separately-worded department documents. The two FAQ PDFs this project's prior passes already found (both archived alongside; fetched fresh, direct from the live host, this pass) describe this SAME "Regional Centre for Training and Production of Mushroom" identically in TWO separately-maintained documents: - FAQsonAgricultureSchemes2025.pdf: "(b) Producing and selling of quality spawn to the growers at 50% subsidized rate ... (c) production of compost & sale of pasteurized compost to the button mushroom growers at 50% subsidized rate" / Pattern of assistance: "Sale of Mushroom Spawn and compost at 50% subsidy." Apply through the nearest Horticulture Development Officer or "Government Mushroom Development Centres located at Upper Shillong, Jowai and Tura." - FAQONHORTICULTURESCHEMES.pdf: "(i) Mushroom spawns at 50%subsidy. (ii) Compost at 50% subsidy.", the SAME 50% figure, independently worded, in a document maintained separately from the Agriculture FAQ (this one is filed under "1. STATE PLAN SCHEMES", matching the brochure's own "continuing State Plan scheme" language exactly). This document ALSO adds two items the Agriculture FAQ omits: "(iii) Construction of compost shed - 50% assistance" and "(iv) Financial assistance to Mushroom growers @ Rs 30,000/- per unit", but this fourth item's own "type of assistance" line scopes it explicitly to "under District Horticulture Officer, West Garo Hills", i.e. it reads as a district-specific allocation, not a stated state-wide entitlement, NOT modelled as a rule here for that reason (understating rather than asserting a state-wide figure the document itself does not claim). The compost shed construction assistance (50%) is likewise not modelled below, to keep this record to the single figure independently corroborated across BOTH FAQ documents. Neither FAQ PDF itself carries a date, GO number or signature, that has not changed. What has changed is that the SCHEME they describe is now independently established as real and authorised by three other documents, and their core figure (50% subsidy on spawn and compost) is identical across two separately-maintained FAQ documents rather than appearing in only one.

A genuine, still-unresolved discrepancy (flagged, not silently resolved): elsewhere in FAQsonAgricultureSchemes2025.pdf, under "II. CENTRALLY SPONSORED SCHEMES" > MIDH, pattern of assistance item "(iii) 40% assistance for Mushroom Cultivation & Bee Keeping" is Meghalaya's own paraphrase of central MIDH's mushroom component at a DIFFERENT rate (40%, not 50%) from the state's own Regional Centre entry a few pages earlier in the SAME document. This is likely an imprecise FAQ simplification of MIDH's NE-Himalayan 50% enhanced rate rather than a genuine override, but is recorded rather than silently reconciled, see the stacking note below.

The Mission was launched as a five-year programme (2018-2023, per the brochure's own title band) that by its own stated timeline concluded three years before this reading (2026), with no "phase 2" or extension document found by this pass. Status is therefore recorded 'unknown', not 'active', this project's rule of understating rather than overstating applies squarely here: the Mission's launch is certain, but its CURRENT operating status in 2026 is not.

Central schemes that apply in Meghalaya

These apply everywhere in India; what changes from state to state is the share they pay. Each line shows the most that scheme pays for any one item at Meghalaya’s rate, and the document it comes from. Between them they also fund a compost yard, a spawn laboratory, a pack house and processing, a cold store, help with loan interest, a credit guarantee and machinery, each at its own rate.

MIDH Operational Guidelines 2025, Annexure V, Item III lists "NE & Himalayan States" among the enhanced-rate areas, defined by its footnote only as "States in North East & Himalayan region covered under HMNEH scheme." That HMNEH enumeration was located at the official HMNEH / TMNEHS scheme portal (Department of Agriculture & Cooperation, Government of India), https://tmnehs.gov.in/, read 11 Sep 2026, archived at content/sources/hmneh-coverage.html (SHA-256 e0193eb29563c36a8c8f69b41299b8f99941e06257a24cea4aa7d68c5d1f9086), which states verbatim: "The mission covers all NE States including Sikkim and three Himalayan states of Jammu & Kashmir, Himachal Pradesh and Uttarakhand." CAVEAT, read before relying on this for a claim: this is a live government page, not an abandoned one, its own footer reads "Last Updated On :17/10/2019" (17 October 2019, verified directly against the archived file), roughly two years after its "What's New" bulletins end (which run only through 2017-18; an earlier version of this note wrongly read that gap, plus the page's boilerplate "© 2010" copyright line, as the whole page being frozen and untouched since, the copyright year is a static template value on this class of government site and does not track content updates). That October 2019 update is still before the Jammu & Kashmir Reorganisation Act, 2019 took effect (31 October 2019, the "appointed day" that split the erstwhile state into the Union Territories of Jammu & Kashmir and Ladakh), and the page's own text still reads "Jammu & Kashmir" as the pre-2019 undivided state, so it still does not speak to how J&K (UT) and Ladakh (UT) are separately treated today, just not because the page was abandoned. See LADAKH_NOTE for how that gap is handled for Ladakh.
  • MIDH₹300.00 lakh

    At most, for its biggest single item: The same Cold Storage Type-I, built instead as a pre-engineered building (PEB) frame combined with civil work and PUF/PIR panels, priced per tonne of storage capacity up to 5,000 MT, at a higher per-MT rate than the plain-civil row.

    Enhanced rate, NE & Himalayan State, 50%.

    MIDH Operational Guidelines 2025Printed 31 December 2024Show evidence

    OPERATIONAL GUIDELINES MISSION FOR INTEGRATED DEVELOPMET OF HORTICULTURE (MIDH Operational Guidelines 2025)

    Department of Agriculture & Farmers Welfare, Government of India (published on nhb.gov.in)

    Printed 31 December 2024

    Annexure V, Item C.7 "Cold Storage Type-I (CS-1)", row (ii), verbatim: "Cold Storage Type-I is defined as CS-1 with Construction in combination of civil & PEB including PUF/PIR panels, Doors and Ante-rooms, Refrigeration Units, Electrical Installation, Administrative block,…Read the full clause
    Annexure V, Item C.7 "Cold Storage Type-I (CS-1)", row (ii), verbatim: "Cold Storage Type-I is defined as CS-1 with Construction in combination of civil & PEB including PUF/PIR panels, Doors and Ante-rooms, Refrigeration Units, Electrical Installation, Administrative block, Safety/Fire Safety and Hazard control and basic mezzanine structure." Cost Norms column, verbatim: "Rs. 12000/MT, (Max 5,000 MT capacity)." Pattern of Assistance column, verbatim: "Credit linked back-ended assistance @ 35% in General areas and 50% in the case of NE & Himalayan States, Scheduled areas, vibrant villages, Andaman & Nicobar and Lakshadweep Islands." plus "Note: Component has to be implemented in accordance to NCCD guidelines only."

    PDF p.66

    Read on 11 September 2026 by chirag.

    Verified against the primary government document.

    See all 8 items MIDH prices
  • NHB Scheme No. 1₹114.75 lakh

    At most, for its biggest single item: The same integrated mushroom unit where the project includes canning, priced at the higher of the two per-tonne norms the clause states.

    Enhanced rate, NE & Himalayan State, 45%.

    NHB Operational Guidelines, January 2025Printed January 2025Show evidence

    National Horticulture Board Operational Guidelines JANUARY 2025 (NHB Operational Guidelines, January 2025)

    National Horticulture Board, Ministry of Agriculture & Farmers Welfare, Government of India (Plot No. 85, Sector-18, Institutional Area, Gurugram 122015)

    Printed January 2025

    Chapter 02, Scheme No. 01, cost norms table, item 1 (vi) (PDF p.17, printed page 7). Item column, verbatim: "Integrated Mushroom Production Unit in project mode". Cost norms column, verbatim: "As per NHB norms for a minimum installed capacity above 50 MT and upto 300 MT in…Read the full clause
    Chapter 02, Scheme No. 01, cost norms table, item 1 (vi) (PDF p.17, printed page 7). Item column, verbatim: "Integrated Mushroom Production Unit in project mode". Cost norms column, verbatim: "As per NHB norms for a minimum installed capacity above 50 MT and upto 300 MT in controlled conditions @ Rs. 75000/MT without canning and @ Rs. 85000/ MT with Canning including Production Unit + Compost making Unit." Pattern of assistance column, verbatim: "Credit linked subsidy @ 40% of eligible project cost in General area and @ 50% of eligible project cost for NER and Himalayan States, Scheduled Areas and UTs of Andaman &Nicobar Islands, Lakshadweep Islands, Jammu & Kashmir and Ladakh." Those two percentages were cut to 35% and 45% by NHB's Public Circular of 21 August 2026, cited separately on every rate this record publishes. Read with Chapter 04, Important Instructions, item 16 (PDF p.51, printed page 40), verbatim: "In case of cold storage/CA storage, Mushroom, Ripening chamber, Reefer Van, Cold room and Pre-cooling unit, the EPC is worked out on the basis of capacity." Chapter 01 dates the whole instrument: "The Scheme guidelines shall be effective from 01.01.2025."

    PDF p.17 (Chapter 02, item 1(vi)); PDF p.51 (Chapter 04, instruction 16); PDF p.14 (Chapter 01, "Date of Coming into force")

    Read on 14 September 2026 by chirag.

    Verified against the primary government document.

    See all 2 items NHB Scheme No. 1 prices
  • PMFMENothing for mushroom

    Read end to end against its primary document: it funds nothing for mushroom cultivation. That is a finding, not a gap.

    Verified against the primary government document.

  • AIFHelp on a loan, not a grant

    What this pays is an ongoing rate against loan repayments rather than a sum towards the build, so there is no single figure to show here. The rates are on its own page.

    Verified against the primary government document.

    See all 2 items AIF prices
  • NABARDNot read yet

    We have not yet read a primary document we can publish a rate against, so this atlas publishes none for it.

    Pending. We have not read a primary document for this yet. We do not publish unverified rates.

  • PMKSY Cold ChainNothing for mushroom

    Read end to end against its primary document: it funds nothing for mushroom cultivation. That is a finding, not a gap.

    Verified against the primary government document.

  • SMAM₹2.40 lakh

    At most, for its biggest single item: The same packing-machine financing, at the general-beneficiary rate.

    Private applicant, NE & Himalayan State, 40%.

    SMAM Operational Guidelines 2024Printed 2024Show evidence

    SUB-MISSION ON AGRICULTURAL MECHANIZATION (SMAM) OPERATIONAL GUIDELINES - 2024 (SMAM Operational Guidelines 2024)

    Ministry of Agriculture and Farmers Welfare, Department of Agriculture & Farmers Welfare, Government of India

    Printed 2024

    Covering letter (PDF p.1), verified against pg-01.png, verbatim: "F.No.3-4/2020-M&T(I&P) (81291), Government of India, Ministry of Agriculture & Farmers Welfare, (Department of Agriculture & Farmers welfare), (Mechanization & Technology Division), Krishi Bhawan, New Delhi,…Read the full clause
    Covering letter (PDF p.1), verified against pg-01.png, verbatim: "F.No.3-4/2020-M&T(I&P) (81291), Government of India, Ministry of Agriculture & Farmers Welfare, (Department of Agriculture & Farmers welfare), (Mechanization & Technology Division), Krishi Bhawan, New Delhi, Dated: 7th November, 2024 — Subject: Revision in the Operational Guidelines of Sub Mission on Agricultural Mechanization under the umbrella of Rashtriya Krishi Vikas Yojana... The guidelines have been revised by inclusion of provisions for financial assistance for the FRA Patta holders beneficiaries." Section 5.1 (PDF p.11), Table of Contents entry and body text both read "Demonstration of newly developed agricultural/ horticultural/ crop residue management machines post-harvest technologies...", explicit confirmation the scheme's scope spans horticulture, not just field-crop agriculture, even though no individual crop (mushroom included) is ever named. See the noMushroomComponent-style finding recorded on the scheme (below) and the per-rule clauses for where the actual computable rates come from (Annexure-I, not Section 5.1, which funds institutional demonstration grants, not individual farmer purchases).

    PDF p.1 (covering letter); p.2 (cover); p.11 (§5.1); p.6 (§4.1); p.20 onward (Annexure-I); p.33 (items q/r/t cited on the rules)

    Read on 11 September 2026 by chirag.

    Verified against the primary government document.

    See all 6 items SMAM prices
  • PM-RKVYNot read yet

    We have not yet read a primary document we can publish a rate against, so this atlas publishes none for it.

    Pending. We have not read a primary document for this yet. We do not publish unverified rates.

What to do next

Work out what your own project would draw.

What you actually draw in Meghalaya depends on what you build and what it costs. The calculator asks where you are, what you are building and what it costs, then prices every scheme on this site against that, shows the document behind each figure, and writes a link you can send to your bank.

Open the calculator

Or have MushroomWale build it.

MushroomWale designs and builds mushroom farms. For the farms we build, we also prepare and pursue the claim: the DPR, the documents, the bank, the sanctioning department and the joint inspection.

We prepare and pursue the claim only for farms we build.

Talk to MushroomWale about building it