Mushroom subsidy in West Bengal

The most a mushroom growing unit draws in West Bengal

₹89.25 lakh

The same integrated mushroom unit where the project includes canning, priced at the higher of the two per-tonne norms the clause states.

Paid by NHB Scheme No. 1.

Private applicant, general area, 35%. You reach that only by building all the way to the scheme’s own limit of 300 MT of installed capacity, which the scheme costs at ₹255.00 lakh. A smaller project draws proportionally less.

Your project must be bigger than 50 MT of installed capacity to qualify at all. Below that it pays nothing at all, not simply less.

Type
State
Which rate applies
General area
Schemes that apply
9
NHB Operational Guidelines, January 2025Printed January 2025Show the clause, the page and our archived copy
Printed in the document as “1 (vi) Integrated Mushroom Production Unit in project mode, with canning”.

National Horticulture Board Operational Guidelines JANUARY 2025 (NHB Operational Guidelines, January 2025)

National Horticulture Board, Ministry of Agriculture & Farmers Welfare, Government of India (Plot No. 85, Sector-18, Institutional Area, Gurugram 122015)

Printed January 2025

Chapter 02, Scheme No. 01, cost norms table, item 1 (vi) (PDF p.17, printed page 7). Item column, verbatim: "Integrated Mushroom Production Unit in project mode". Cost norms column, verbatim: "As per NHB norms for a minimum installed capacity above 50 MT and upto 300 MT in…Read the full clause
Chapter 02, Scheme No. 01, cost norms table, item 1 (vi) (PDF p.17, printed page 7). Item column, verbatim: "Integrated Mushroom Production Unit in project mode". Cost norms column, verbatim: "As per NHB norms for a minimum installed capacity above 50 MT and upto 300 MT in controlled conditions @ Rs. 75000/MT without canning and @ Rs. 85000/ MT with Canning including Production Unit + Compost making Unit." Pattern of assistance column, verbatim: "Credit linked subsidy @ 40% of eligible project cost in General area and @ 50% of eligible project cost for NER and Himalayan States, Scheduled Areas and UTs of Andaman &Nicobar Islands, Lakshadweep Islands, Jammu & Kashmir and Ladakh." Those two percentages were cut to 35% and 45% by NHB's Public Circular of 21 August 2026, cited separately on every rate this record publishes. Read with Chapter 04, Important Instructions, item 16 (PDF p.51, printed page 40), verbatim: "In case of cold storage/CA storage, Mushroom, Ripening chamber, Reefer Van, Cold room and Pre-cooling unit, the EPC is worked out on the basis of capacity." Chapter 01 dates the whole instrument: "The Scheme guidelines shall be effective from 01.01.2025."

PDF p.17 (Chapter 02, item 1(vi)); PDF p.51 (Chapter 04, instruction 16); PDF p.14 (Chapter 01, "Date of Coming into force")

Read on 14 September 2026 by chirag.

The most any one of the 9 schemes that apply here pays for the growing rooms themselves, never a total of them. The growing rooms are not all these schemes fund: see what else they price.

West Bengal is paid at the ordinary rate, unless your own site sits inside a notified scheduled area or vibrant village. That is decided site by site, not state by state, so it is worth checking for your plot. West Bengal’s own scheme is verified: it funds mushroom cultivation at prices it does not set itself, which are MIDH's, though we could not confirm from the document that the scheme is still running.

See how these schemes actually work for the myths, limits and loopholes behind every figure.

What decides whether you get anything

These are the conditions NHB Scheme No. 1 carries, the scheme behind the figure above. Each of the other schemes on this page carries its own, set out on its own page.

Does this need a bank loan? (credit linked)
Yes. The subsidy rides on a bank loan: a bank sanctions the loan and the subsidy is adjusted against it.
When does the money arrive? (back ended)
After you build, and after an inspection. The subsidy is held in a reserve account and released once the project has been inspected and found complete, not paid up front.
Must it be approved before you start work? (sanction before commencement)
Sanction before commencement applies. The approving authority must issue its sanction before eligible expenditure is incurred. Read what starting work early costs you.

West Bengal’s own scheme

West Bengal's MIDH mushroom component

West Bengal State Horticulture Development Society, Department of Food Processing Industries & Horticulture, Government of West Bengal (Mayukh Bhavan, Kolkata 700091)

Verified. Read on 13 September 2026, against the primary government document. We could not confirm the scheme is still running, so check with the department before you rely on it.

Read end to end against its primary document. It funds mushroom cultivation without setting a rate of its own for it: the cost norms are MIDH’s, which this atlas publishes in full.

What we read, and why we cannot confirm it is still currentRead the full note

West Bengal, VERIFIED 2026-09-13, and not from the department's own website, which has not answered a single request since this project's very first pass reached it. The document is the Government of India's own approval of West Bengal's Annual Action Plan under MIDH, published on a central host that is up and complete where the state's is not.

It opens with the signed approval letter: File No. 33-24/2017-MIDH (AAP), Horticulture Division, Krishi Bhawan, dated 19th September 2019, signed by M.K. Mishra, Deputy Secretary to the Government of India, and addressed to the "Mission Director/Director (Hort.), West Bengal State Horticulture Development Society, Department of Food Processing Industries & Horticulture, Mayukh Bhavan (Top Floor), Bidjannagar, Kolkata - 700091", the department this record already named, at its own address, with the letter reproducing the misspelling of Bidhannagar itself. It approves implementation of the National Horticulture Mission under MIDH in the State during 2019-20 with a total outlay of Rs 5,333.28 lakh, split 60% Government of India to 40% State, and it binds that spending at its Term II: "Expenditure on approved activities shall be in conformity with the norms laid down in the operational guidelines of the scheme."

That single sentence closes a gap this record has carried since its first pass. West Bengal's own umbrella department states, in its Section 4(1)(b) RTI proactive disclosure, that "There is no subsidy programme running under this Department directly but Directorate of Horticulture, Directorate of Food Processing Industries and Directorate of COMP are implementing various subsidy related schemes like RKVY and MIDH", the department saying it runs nothing of its own and names MIDH as what its directorates run. This letter is the other half of that: MIDH, running here, on MIDH's own cost norms. The state does not set a mushroom rate because there is no state mushroom rate to set.

WHAT THE APPROVED TABLE PRINTS, AND WHY NO RULE IS RECORDED FROM IT. Item "Mushrooms" of the 2019-20 table carries a production unit row under a column headed "Maximum permissible cost", entering "Rs. 20.00 lakh/ unit" for both the public sector at 100% of cost and the private sector at 40% "as credit linked back ended subsidy". Those are the superseded CENTRAL norms, not West Bengal's own schedule: the current central guideline prices the same production unit at Rs 30 lakh. This atlas sets out where the older figure comes from under "The Rs 20 lakh figure is the old central one" in How it works. Publishing it here as a West Bengal rate would manufacture a state schedule out of a central one and understate what a grower here can claim, so no rule is recorded at those figures, and none at the current central figures either, since Term II binds this plan to the guidelines as they stood in 2019, and a 2019 letter cannot speak for what a 2026 application will be assessed against. What a grower here should take to the department is the central guideline in force, which this site publishes in full.

THE COMPONENT WENT QUIET, THEN CAME BACK. The 2019-20 plan prints the mushroom norms and allocates nothing against them: every figure on the row is 0.00, and the sub-total for mushrooms is 0.00. The 2021-22 plan is barer still, keeping the "Mushrooms" heading and its nil sub-total while dropping the component rows altogether. By the 2024-25 plan the component is funded again, and at some scale: one public and two private mushroom production units, and one public and one private spawn making unit: five units against Rs 57.00 lakh in all. So West Bengal's mushroom component is not a dead letter that survives only on paper. It is a real budget line that was empty for at least two of the years read here and is not empty now.

WHY THE STATUS IS "unknown" RATHER THAN ACTIVE. The most recent plan read is 2024-25, two financial years back, and it is a planning document rather than a current sanction. More to the point, the state's own machinery remains unreadable: wbfpih.wb.gov.in read once, on this project's first pass, and has not responded to a single request in the three passes since, failing at the TCP connection stage rather than returning anything at all; and the two guideline PDFs the directorate's own page links (its "NHM guideline" and its "MIDH Guideline") are served through a dynamic download endpoint that the Internet Archive captured the links to but never followed, so neither has ever been retrievable, live or archived. Nothing in this record rests on that department's site; but nothing in this record can confirm what that site would say today either.

WHERE THE LIVE COPY WENT. midh.gov.in no longer serves these plans: the site is now an Angular application, and the exact URL above answers with HTTP 200 and 25,176 bytes of HTML shell titled "MIDH-Suraksha" instead of a PDF. Verified directly on this URL during this pass, and on two others. A fetcher that checks only the status code will record this document as live. It is not; every copy cited here was recovered from the Internet Archive and its digest re-verified against the capture it came from.

ON READING A BAD SCAN. This document is a scan with a poor text layer, pdftotext renders its "100%" as "1 00o/o" and its "40%" as "40olo", so every figure quoted here was read off a rendered page image rather than the extracted text, including the printed date, which is fully written out as "19th September, 2019" and is the only complete printed date among the approval letters in this set.

EARLIER PASSES, kept for what they ruled out rather than what they found. A sweep of the directorate's own upload folder recovered ten PDFs the site did serve successfully: nine are corporation tender notices, area and production statistics and survey reports with no mushroom content, and the tenth is the RTI disclosure quoted above. Forty NABARD-drafted "Model Project Profiles" served through the same download wrapper are bankable-DPR templates for the Directorate of Food Processing, not for horticulture's cultivation schemes; one is a mushroom canning-plant template whose only financing line is an unquantified reference to Ministry of Food Processing Industries assistance, which is a processing subsidy and a different question from a cultivation one. A domain-wide search of the wb.gov.in tree for mushroom-named files returns vocational-training material only. Both state agricultural universities run genuine mushroom research and spawn-production training courses, which are curricula, not subsidy rates.

Central schemes that apply in West Bengal

These apply everywhere in India; what changes from state to state is the share they pay. Each line shows the most that scheme pays for any one item at West Bengal’s rate, and the document it comes from. Between them they also fund a compost yard, a spawn laboratory, a pack house and processing, a cold store, help with loan interest, a credit guarantee and machinery, each at its own rate.

  • MIDH₹210.00 lakh

    At most, for its biggest single item: The same Cold Storage Type-I, built instead as a pre-engineered building (PEB) frame combined with civil work and PUF/PIR panels, priced per tonne of storage capacity up to 5,000 MT, at a higher per-MT rate than the plain-civil row.

    Private applicant, general area, 35%.

    MIDH Operational Guidelines 2025Printed 31 December 2024Show evidence

    OPERATIONAL GUIDELINES MISSION FOR INTEGRATED DEVELOPMET OF HORTICULTURE (MIDH Operational Guidelines 2025)

    Department of Agriculture & Farmers Welfare, Government of India (published on nhb.gov.in)

    Printed 31 December 2024

    Annexure V, Item C.7 "Cold Storage Type-I (CS-1)", row (ii), verbatim: "Cold Storage Type-I is defined as CS-1 with Construction in combination of civil & PEB including PUF/PIR panels, Doors and Ante-rooms, Refrigeration Units, Electrical Installation, Administrative block,…Read the full clause
    Annexure V, Item C.7 "Cold Storage Type-I (CS-1)", row (ii), verbatim: "Cold Storage Type-I is defined as CS-1 with Construction in combination of civil & PEB including PUF/PIR panels, Doors and Ante-rooms, Refrigeration Units, Electrical Installation, Administrative block, Safety/Fire Safety and Hazard control and basic mezzanine structure." Cost Norms column, verbatim: "Rs. 12000/MT, (Max 5,000 MT capacity)." Pattern of Assistance column, verbatim: "Credit linked back-ended assistance @ 35% in General areas and 50% in the case of NE & Himalayan States, Scheduled areas, vibrant villages, Andaman & Nicobar and Lakshadweep Islands." plus "Note: Component has to be implemented in accordance to NCCD guidelines only."

    PDF p.66

    Read on 11 September 2026 by chirag.

    Verified against the primary government document.

    See all 8 items MIDH prices
  • NHB Scheme No. 1₹89.25 lakh

    At most, for its biggest single item: The same integrated mushroom unit where the project includes canning, priced at the higher of the two per-tonne norms the clause states.

    Private applicant, general area, 35%.

    NHB Operational Guidelines, January 2025Printed January 2025Show evidence

    National Horticulture Board Operational Guidelines JANUARY 2025 (NHB Operational Guidelines, January 2025)

    National Horticulture Board, Ministry of Agriculture & Farmers Welfare, Government of India (Plot No. 85, Sector-18, Institutional Area, Gurugram 122015)

    Printed January 2025

    Chapter 02, Scheme No. 01, cost norms table, item 1 (vi) (PDF p.17, printed page 7). Item column, verbatim: "Integrated Mushroom Production Unit in project mode". Cost norms column, verbatim: "As per NHB norms for a minimum installed capacity above 50 MT and upto 300 MT in…Read the full clause
    Chapter 02, Scheme No. 01, cost norms table, item 1 (vi) (PDF p.17, printed page 7). Item column, verbatim: "Integrated Mushroom Production Unit in project mode". Cost norms column, verbatim: "As per NHB norms for a minimum installed capacity above 50 MT and upto 300 MT in controlled conditions @ Rs. 75000/MT without canning and @ Rs. 85000/ MT with Canning including Production Unit + Compost making Unit." Pattern of assistance column, verbatim: "Credit linked subsidy @ 40% of eligible project cost in General area and @ 50% of eligible project cost for NER and Himalayan States, Scheduled Areas and UTs of Andaman &Nicobar Islands, Lakshadweep Islands, Jammu & Kashmir and Ladakh." Those two percentages were cut to 35% and 45% by NHB's Public Circular of 21 August 2026, cited separately on every rate this record publishes. Read with Chapter 04, Important Instructions, item 16 (PDF p.51, printed page 40), verbatim: "In case of cold storage/CA storage, Mushroom, Ripening chamber, Reefer Van, Cold room and Pre-cooling unit, the EPC is worked out on the basis of capacity." Chapter 01 dates the whole instrument: "The Scheme guidelines shall be effective from 01.01.2025."

    PDF p.17 (Chapter 02, item 1(vi)); PDF p.51 (Chapter 04, instruction 16); PDF p.14 (Chapter 01, "Date of Coming into force")

    Read on 14 September 2026 by chirag.

    Verified against the primary government document.

    See all 2 items NHB Scheme No. 1 prices
  • PMFMENothing for mushroom

    Read end to end against its primary document: it funds nothing for mushroom cultivation. That is a finding, not a gap.

    Verified against the primary government document.

  • AIFHelp on a loan, not a grant

    What this pays is an ongoing rate against loan repayments rather than a sum towards the build, so there is no single figure to show here. The rates are on its own page.

    Verified against the primary government document.

    See all 2 items AIF prices
  • NABARDNot read yet

    We have not yet read a primary document we can publish a rate against, so this atlas publishes none for it.

    Pending. We have not read a primary document for this yet. We do not publish unverified rates.

  • PMKSY Cold ChainNothing for mushroom

    Read end to end against its primary document: it funds nothing for mushroom cultivation. That is a finding, not a gap.

    Verified against the primary government document.

  • SMAM₹2.40 lakh

    At most, for its biggest single item: The same packing-machine financing, at the general-beneficiary rate.

    Private applicant, general area, 40%.

    SMAM Operational Guidelines 2024Printed 2024Show evidence

    SUB-MISSION ON AGRICULTURAL MECHANIZATION (SMAM) OPERATIONAL GUIDELINES - 2024 (SMAM Operational Guidelines 2024)

    Ministry of Agriculture and Farmers Welfare, Department of Agriculture & Farmers Welfare, Government of India

    Printed 2024

    Covering letter (PDF p.1), verified against pg-01.png, verbatim: "F.No.3-4/2020-M&T(I&P) (81291), Government of India, Ministry of Agriculture & Farmers Welfare, (Department of Agriculture & Farmers welfare), (Mechanization & Technology Division), Krishi Bhawan, New Delhi,…Read the full clause
    Covering letter (PDF p.1), verified against pg-01.png, verbatim: "F.No.3-4/2020-M&T(I&P) (81291), Government of India, Ministry of Agriculture & Farmers Welfare, (Department of Agriculture & Farmers welfare), (Mechanization & Technology Division), Krishi Bhawan, New Delhi, Dated: 7th November, 2024 — Subject: Revision in the Operational Guidelines of Sub Mission on Agricultural Mechanization under the umbrella of Rashtriya Krishi Vikas Yojana... The guidelines have been revised by inclusion of provisions for financial assistance for the FRA Patta holders beneficiaries." Section 5.1 (PDF p.11), Table of Contents entry and body text both read "Demonstration of newly developed agricultural/ horticultural/ crop residue management machines post-harvest technologies...", explicit confirmation the scheme's scope spans horticulture, not just field-crop agriculture, even though no individual crop (mushroom included) is ever named. See the noMushroomComponent-style finding recorded on the scheme (below) and the per-rule clauses for where the actual computable rates come from (Annexure-I, not Section 5.1, which funds institutional demonstration grants, not individual farmer purchases).

    PDF p.1 (covering letter); p.2 (cover); p.11 (§5.1); p.6 (§4.1); p.20 onward (Annexure-I); p.33 (items q/r/t cited on the rules)

    Read on 11 September 2026 by chirag.

    Verified against the primary government document.

    See all 6 items SMAM prices
  • PM-RKVYNot read yet

    We have not yet read a primary document we can publish a rate against, so this atlas publishes none for it.

    Pending. We have not read a primary document for this yet. We do not publish unverified rates.

What to do next

Work out what your own project would draw.

What you actually draw in West Bengal depends on what you build and what it costs. The calculator asks where you are, what you are building and what it costs, then prices every scheme on this site against that, shows the document behind each figure, and writes a link you can send to your bank.

Open the calculator

Or have MushroomWale build it.

MushroomWale designs and builds mushroom farms. For the farms we build, we also prepare and pursue the claim: the DPR, the documents, the bank, the sanctioning department and the joint inspection.

We prepare and pursue the claim only for farms we build.

Talk to MushroomWale about building it